Skip to article

Staffing

Why Telecom Providers ShouldReconsider How They Staff Engineering

Telecom providers have traditionally staffed their engineering teams around three assumptions:

  • Volume will stay near the forecast.
  • Margins will have room to staff up for peak demand.
  • Experienced engineers will be readily available.

Each was a reasonable bet when providers settled on a standard staffing model. An in-house team gave them dependable coverage and direct control over how the work ran. For a long time, staffing this way worked, and few had reason to question it.

It works less well now, and three specific moments explain why:

When volume moves

Forecasts assume steady work, yet telecom work is rarely predictable. A migration needs to get done, E‑Rate season starts, a sales promotion succeeds, a new product or market opens up, or volume jumps for a month or two before settling. But hiring and ramping up new engineers often takes longer than the spike itself, while fixed contract terms tend to outlast the added volume.

When margins constrict

Pricing pressure keeps squeezing what providers earn on each order. That makes every new hire or contract harder to approve, even when the workload calls for more people. So teams stay lean. But when the work picks up, the people already there have to absorb it, increasing the chances that turnaround times slip and mistakes creep in, causing rework and delays.

When experience leaves

Experience is harder to replace than headcount. As engineers retire and the pool of people who can step into their roles shrinks, losing one or two veteran team members can leave your team short-handed. Your remaining engineers cover the gap until you hire someone new, and even then it takes time to bring them fully up to speed.

Cost That Follows the Work

There's a different way to staff the work: tie engineering costs to completed work. Rather than staffing up to absorb every spike, you bring in experienced engineers on demand and only pay for the work they finish.

Each ticket or project has a defined scope and a clear point where it counts as complete, so there's no question about what you're paying for and when.

This way, you can get more work done without stretching your team. When a migration lands or volume jumps, experienced engineers handle the extra work alongside your people, so turnaround times hold up and fewer mistakes slip through. And when someone retires, the work can keep moving while you take the time to hire the right person.

Planning gets easier, too. Each migration or batch of orders carries a known price before the work starts, so you can budget from your forecast, and what you spend follows the work that comes in.

What you spend follows the work that comes in.

This approach doesn't aim to replace in-house engineers. They carry knowledge that takes years to build, and the work that depends on it belongs with them. On-demand engineers cover the spikes, gaps, and new projects, so your team has more time to focus on strategic and revenue-generating work.

The Widget Model

A Different Model

Tying engineering cost to completed work means your team gets extra help when it needs it, without stretching the people you have or hiring well ahead of demand.

At Managed Telecom Services, we've built our company around this idea. We call our approach the widget model. It starts with a defined unit of work, like a migrated circuit or a new service provisioned on your network, that you hand over as a ticket or a project. Our engineers complete it following your established procedures. And because you pay for completed work only, with no staffing contract or bench time behind it, speed and quality matter more than the hours it takes.

  • Hand over the workA defined unit of work, sent as a ticket or a project
  • We complete itTeams follow your established procedures
  • Pay when it's doneNo staffing contract or bench time behind it

The model works the same way at any size. A national carrier can take on a market expansion without building a team for it. A regional network can keep tickets moving when a retirement would otherwise leave it short‑handed.

If you're rethinking how to staff your engineering work, let us know what you're considering.